WELDING PROCEDURE SPECIFICATION (WPS)
Clause 5 — Prequalified — AWS D1.1:2020
WPS Number
WIQ-FCAW-71T1M-G2-5G-001
Title
FCAW-G E71T-1M (75/25) — CJP V-Groove 60° — Group II — 5G Pipe Fixed
JOINT DESIGN
Code Reference
Figure 5.1 — B-U2-GF (pipe)
DESIGNATION: B-U2-GF (pipe 5G)
| DIMENSION | AS DETAILED | AS FIT-UP TOLERANCE | NOTES |
|---|
| Groove Angle (α) | 60° | +10°, −5° | — |
| Root Opening (R) | 3/16 in | +1/16 in, −0 | Wider root for wire feed root |
| Root Face (f) | 0 to 1/16 in | Not limited | — |
| Pipe Diameter | ≥ 4 in OD | — | — |
BASE METAL
Specifications
A36 (all thk), A53 Gr B, A500 Gr B/C, A501, A516 Gr 65/70, A529 Gr 50/55, A572 Gr 42, A572 Gr 50, A572 Gr 55, A588, A709 Gr 36, A709 Gr 50, A709 Gr 50S, A709 Gr 50W, A709 HPS50W, A710 Gr A, A913 Gr 50, A992, A1011 HSLAS Gr 50, A1018, A1085, API 5L X52, API 5L X60, API 5L X65, ABS Gr A/B/D/E
Thickness Range
Schedule 40+ (wall ≥ 3/16 in)
POSITION
Vertical Progression
uphill
PREHEAT & INTERPASS TEMPERATURE
Minimum Preheat
32°F (≤3/4 in) / 50°F (>3/4–1-1/2 in) / 150°F (>1-1/2–2-1/2 in) / 300°F (>2-1/2 in)
Code Reference
Table 5.8, Category B
APPROVED FILLER METAL SIZES
Welder may use any size listed below. Each size has its own amperage/voltage range and position limit per Table 5.1.
| Size | Class | Amps | Volts | Position Limit | Notes |
|---|
| 0.035 in | E71T-1M | 130-220 | 24-29 | All | Any pass — smoother arc |
| 0.045 in | E71T-1M | 150-320 | 24-31 | All | Any pass — smoother arc |
| 0.052 in | E71T-1M | 180-380 | 25-32 | All (reduced WFS for V/OH) | Any pass — smoother arc |
WELDING PARAMETERS
| Pass | Process | Filler / Class | Size | Current | Amps | Volts | Speed | Technique |
|---|
| Root | FCAW-G | E71T-1M | 0.035 in | DCEP | 130-220 | 24-29 | 8-16 in/min | either / uphill |
| Root | FCAW-G | E71T-1M | 0.045 in | DCEP | 150-320 | 24-31 | 8-16 in/min | either / uphill |
| Root | FCAW-G | E71T-1M | 0.052 in | DCEP | 180-380 | 25-32 | 8-16 in/min | either / uphill |
| Hot Pass | FCAW-G | E71T-1M | 0.035 in | DCEP | 130-220 | 24-29 | 8-16 in/min | either / uphill |
| Hot Pass | FCAW-G | E71T-1M | 0.045 in | DCEP | 150-320 | 24-31 | 8-16 in/min | either / uphill |
| Hot Pass | FCAW-G | E71T-1M | 0.052 in | DCEP | 180-380 | 25-32 | 8-16 in/min | either / uphill |
| Fill | FCAW-G | E71T-1M | 0.035 in | DCEP | 130-220 | 24-29 | 8-16 in/min | either / uphill |
| Fill | FCAW-G | E71T-1M | 0.045 in | DCEP | 150-320 | 24-31 | 8-16 in/min | either / uphill |
| Fill | FCAW-G | E71T-1M | 0.052 in | DCEP | 180-380 | 25-32 | 8-16 in/min | either / uphill |
| Cap | FCAW-G | E71T-1M | 0.035 in | DCEP | 130-220 | 24-29 | 8-16 in/min | either / uphill |
| Cap | FCAW-G | E71T-1M | 0.045 in | DCEP | 150-320 | 24-31 | 8-16 in/min | either / uphill |
| Cap | FCAW-G | E71T-1M | 0.052 in | DCEP | 180-380 | 25-32 | 8-16 in/min | either / uphill |
PREQUALIFIED VARIABLE TOLERANCES (TABLE 5.2)
| VARIABLE | TOLERANCE | NOTES |
|---|
| Amperage (Current) | ± 10% | From values specified on WPS |
| Voltage | ± 15% | From values specified on WPS |
| Travel Speed | ± 25% | From values specified on WPS |
| Wire Feed Speed | ± 10% | GMAW, FCAW, SAW only |
TABLE 5.1 ADDITIONAL LIMITS
•Pass width at surface ≥ pass depth (width/depth rule)
•Vertical progression: uphill (except undercut repair with ≥70°F preheat)
•Power source: Constant Voltage (CV) required
TECHNIQUE
Cleaning
Wire brush/grind. Less spatter than CO2.
FIELD TIPS — WeldIQ
▸Maintain consistent stickout (5/8 to 1 in). Too long = excess spatter. Too short = burnback.
▸Check gas flow before welding — flowmeter should read 35-50 CFH. Draft/wind will blow gas away; use windscreens in field.
▸100% CO2: more penetration but more spatter than mixed gas. Good for thicker sections and field work.
▸Open root: fit-up is EVERYTHING. Consistent root opening = consistent penetration. Check gap at least every 12 inches.
▸Use bridge tacks or tack from inside when possible. Tacks in the groove must be ground to feather edge before root pass.
▸Pipe: weld 12→6 clock on one side, then 12→6 on the other. Tie-ins at 6 and 12 o'clock need extra attention.
▸Internal purge may be required for certain specs (stainless, alloy). Check project requirements.
▸Verify preheat with a temperature-indicating crayon (Tempilstik) or contact pyrometer. Check 3 inches from the weld on both sides.
CODE CITATIONS
D1.1:2020 Clause 5.2 · Table 5.3 Group II · Table 5.4 (E71T-1M/A5.20) · Table 5.8 Cat B
Generated by WeldIQ™ · AWS D1.1:2020 · Prequalified per Clause 5 — Prequalified